Construction
Verified carbon project
Wooden Building Elements Carbon Removals Project in Agder, Norway
Storing Carbon in Timber Construction and Replacing Carbon-Intensive Building Materials
Climate-Positive Buildings Through Engineered Wood This project supports the manufacturing and use of glulam timber beams for commercial construction in Norway.

- Location
- Agder, Norway
- Project type
- CORCs – Bio-based Construction Materials
- Project ID
- Puro.earth #847673
- Status
- Registered
- Annual reductions
- 541 kg CO₂e per cubic metre of glulam produced
- Crediting period
- Ongoing (first issuance in 2019)
- Community impact
- Climate-resilient construction, sustainable forestry, regional economic development
Verified carbon projects sit alongside reduction. They do not make a venue or event carbon neutral or net zero.
What the project does.
This project supports the manufacturing and use of glulam timber beams for commercial construction in Norway. Produced in Agder, each cubic metre of glulam stores 541 kg of CO₂ absorbed during tree growth. The timber is harvested from sustainably managed Norwegian and Swedish forests certified under the PEFC chain of custody, ensuring continuous forest regeneration and expansion.
The glulam elements are used in high-performance, long-lifespan buildings that lock carbon away for at least 50 years, often exceeding 100 years. Replacing traditional concrete and steel components with wood significantly lowers the emissions footprint of large-scale construction. The project is audited under the Puro Standard, which ensures accuracy, transparency, and permanence in carbon removals through long-lived timber structures.
CORCs – Bio-based Construction Materials
541 kg CO₂e per cubic metre of glulam produced
Climate benefits and community impact.
The project has a strong commitment to environmental and sustainable development that benefit local communities through the following contributions:
Environment
Each cubic metre of glulam removes 541 kg of CO₂ from the atmosphere, and by displacing reinforced concrete, the project avoids an additional 300 kg CO₂ per cubic metre in emissions. While these avoided emissions are not credited under Puro’s methodology, they are a measurable climate benefit. Additionally, sustainable forestry reduces wildfire and disease risk, enhances biodiversity, and improves ecosystem health.
Community
The project supports the creation of healthier buildings that “breathe” better than conventional materials, improving indoor air quality and wellbeing. Forest stewardship is deeply embedded in local communities, ensuring long-term sustainable practices and environmental education.
Employment and Industry
This project facility in Agder supports rural job creation and technical skill development in the growing climate-smart construction sector. Revenue from CORCs enables this material to remain competitive against high-emission material suppliers and invest in electrification, automation, and operational efficiency.
Innovation and Longevity
Glulam elements are precision-engineered and cut to order, minimising construction site waste. Buildings made with this products are designed for long-term performance and likely to be renovated, recycled, or repurposed rather than demolished—ensuring the stored carbon remains locked away well beyond their minimum regulatory life.
The project is third-party verified by DNV GL and follows the Puro Standard for bio-based construction materials. Carbon removals are calculated using full life cycle assessment (LCA), including upstream emissions, as defined by ISO 14044 and ISO 14064.
The place, as recorded.





The goals this project supports.
Goal 11Sustainable cities and communities
Goal 13Climate action
Wooden Building Elements Carbon Removals Project in Moelv, Norway
Find the right connection for your events.
Talk through your reporting scope, residual emissions and wider climate action ambitions.
Book a demo